1st Floor Floor

The week ended at a good stopping point – the first floor joists and deck were finished on Friday with the garage door beam and sloped joists installed over the garage (for the front porch/deck).

48 FramingGarBm_01   48 FramingDeckJoists_01

More might have been done, but the wrong size lumber was delivered for the exterior walls.  Maybe the right material was delivered elsewhere, marked correctly for the ZABEL Residence?

48 ZEBAL

We also swung by and painted lines to mark the limits of the digging for the retaining walls.

48 RetWallExcav_01   48 RetWallExcav_02